top of page

Kentucky Water Tower
Project Type:
Waterfront Maintenance
Service Area:
Marine Construction
Market:
Water
Location:
Lexington, Kentucky
Overview:
We rehabilitated a historic water tower that controls intake flow to the local pumping station by restoring all eight intakes, installing stainless steel sluice gates and blind flanges, and dewatering the system to install CIPP lining in the tower discharge pipe and downstream piping. Work also included replacing existing gate and motor actuated valves to restore reliability and support long-term operation of the intake and pumping infrastructure serving the local Reservoir.



bottom of page




