|
Building on a strong history of successful project delivery for River Bend Ag, LLC, Marine Solutions was selected to provide design-build services for upgrades at their New Madrid dock facility. This work supported the recent replacement of the facility’s material handling equipment.
Marine Solutions led the design and construction for the installation of two new 72-inch monopile dolphins and associated pile guide systems connected to the existing dock barge. Dive teams also performed demolition of existing structures and identified debris and hazards to support safe pile driving operations. These improvements enhanced the captured barge dock’s resilience and increased operational capabilities during extreme high-water conditions. Working collaboratively with the owner and a trusted subcontractor, Marine Solutions delivered a turn-key seamless solution within six months of proposal, strengthening River Bend Ag’s operations and improving efficiency for the local agricultural community.
0 Comments
Your comment will be posted after it is approved.
Leave a Reply. |
|
© 2010-2026 Marine Solutions, Inc.
|
AFFILIATES
|